2.8 KM Flowline From Takri 2 To Aliabad Facility
-
MCC Shed Repair at MKK
-
3.5'' X 6.2 KM Tubing Laying Sukhi South -1
-
Cutting, Beveling and Coating Wrapping of 2 7/8 Tubbing for BSD 10 and Umer 11
-
Laying of 6'' x 10 KM From Barki to Aliabad Facility
-
Mechanical Works For Naimat West Mid Point
-
Laying Of 6'' x 2 KM Flowline From Umar 9 to Umar Facility
-
Laying Of Flowline 4'' x 2 KM Umar Remote to Umar 9
-
BOQ-2 Procurement Of Services For Naimat West & Sutiari Wells Testing Project
-
Package - 4 Mechanical Works (With 4 CI Skids) Compressor
-
Package 2A & 2B Mechanical Works (Compressor)
-
BOQ For the Risers Installation at 12" existing Trunkline of Buzdar to Mazari & BOQ For the 4" Riser Installation at Lodano-4 using 4" existing FL of Dhani-2
-
Umar-8 Flowline Construction
-
Mechanical Works At Takri-1 & Aliabad Facility (Flowline)
-
Surface Piping Works at Naimat Facility for Sutiari Loopline
-
Retrieval of 6" x 4.5 KM flowline from Unarpur-2 to Aliabad Facility & Transportation To Naimat Warehouse
-
Isra-1 FL Project Well head setup Installation
-
Isra-1 Flowline Project Surface setup modification at Rajani Remote
-
Baqa 1 Jet Pump
-
Surface Piping Works for Fuel Gas Modification at Naimat Facility
-
Surface Piping Works at Umar Remote and Umar-7 at Umar-7 Flow Line Project.
-
Mechanical Works for Takht-3
-
Relocation and Installation of Jet Pump Fabrication, Placement, Preparation and Design Modification Assu Deep-1 To Taj-2
-
Naimat High CO2 Compression Project (Package 2) Pig Launcher and Receiver Skid , Mechanical Works for NW-4 Project
-
Relocation and Installation of Jet Pump Fabrication, Placement, Preparation and Design Modification Assu 1 To Taj-6
-
Surface Piping Works For Qubul-2 Flowline Project
-
Fabrication of platform, crossover and monkey ladder at Naimat PH-V. Installation of test separator V-4110 at Singhar-1.
-
Replacement and Installation of cooler bundle at Naimat West-03. Fabrication and Installation of HCDP analyzer at Naimat POD
-
Installation of separator with fabrication of modified design as pes site at Takhat-01. Fabrication and Installation of Slug Catcher blow case (V-18036) at Rajani lease. Installation and Fabrication of pipeline POD at metering station UEPL to SSGCL. Installation & Relocation of compressor C-4601 from ladano remote.
-
Fabrication and Installation of Well-head surface setup at Taj-07. Fabrication and Installation of Well-head surface setup at NWDT-01.
-
The fabrication of separate filling provision loading dock NAIMAT PH I & II. Installation of lean amine pump with suction and discharge spool fabrication & welding PWHD.