Projects

We are Always Ready for a Challenge.

Our journey is defined by successful project delivery built on commitment, innovation, and perfect HSE and QA/QC practices. Every milestone reflects trusted performance under the highest industry standards.

75+
Projects Done
10+
Years of Experience
125+
Team Members
Projects WE have Finished

Notable Milestones

WhatsApp Image 2026-04-25 at 5.05.00 PM (2)

UEPL

2.8 KM Flowline From Takri 2 Aliabad Facility

IMG_5890

UEPL

MCC Shed Repair Works 

2

UEPL

Laying 6'' x 10 Km 

Barki 1 to Aliabad Facility

project4

Beatae vitae

project5

Explicabo

project6

Voluptatem

  • 2.8 KM Flowline From Takri 2 To Aliabad Facility
  • MCC Shed Repair at MKK
  • 3.5'' X 6.2 KM Tubing Laying Sukhi South -1
  • Cutting, Beveling and Coating Wrapping of 2 7/8 Tubbing for BSD 10 and Umer 11
  • Laying of 6'' x 10 KM From Barki to Aliabad Facility
  • Mechanical Works For Naimat West Mid Point
  • Laying Of 6'' x 2 KM Flowline From Umar 9 to Umar Facility
  • Laying Of Flowline 4'' x 2 KM Umar Remote to Umar 9
  • BOQ-2 Procurement Of Services For Naimat West & Sutiari Wells Testing Project
  • Package - 4 Mechanical Works (With 4 CI Skids) Compressor
  • Package 2A & 2B Mechanical Works (Compressor)
  • BOQ For the Risers Installation at 12" existing Trunkline of Buzdar to Mazari & BOQ For the 4" Riser Installation at Lodano-4 using 4" existing FL of Dhani-2
  • Umar-8 Flowline Construction
  • Mechanical Works At Takri-1 & Aliabad Facility (Flowline)
  • Surface Piping Works at Naimat Facility for Sutiari Loopline
  • Retrieval of 6" x 4.5 KM flowline from Unarpur-2 to Aliabad Facility & Transportation To Naimat Warehouse
  • Isra-1 FL Project Well head setup Installation
  • Isra-1 Flowline Project Surface setup modification at Rajani Remote
  • Baqa 1 Jet Pump
  • Surface Piping Works for Fuel Gas Modification at Naimat Facility
  • Surface Piping Works at Umar Remote and Umar-7 at Umar-7 Flow Line Project.
  • Mechanical Works for Takht-3
  • Relocation and Installation of Jet Pump Fabrication, Placement, Preparation and Design Modification Assu Deep-1 To Taj-2
  • Naimat High CO2 Compression Project (Package 2) Pig Launcher and Receiver Skid , Mechanical Works for NW-4 Project
  • Relocation and Installation of Jet Pump Fabrication, Placement, Preparation and Design Modification Assu 1 To Taj-6
  • Surface Piping Works For Qubul-2 Flowline Project
  • Fabrication of platform, crossover and monkey ladder at Naimat PH-V. Installation of test separator V-4110 at Singhar-1.
  • Replacement and Installation of cooler bundle at Naimat West-03. Fabrication and Installation of HCDP analyzer at Naimat POD
  • Installation of separator with fabrication of modified design as pes site at Takhat-01. Fabrication and Installation of Slug Catcher blow case (V-18036) at Rajani lease. Installation and Fabrication of pipeline POD at metering station UEPL to SSGCL. Installation & Relocation of compressor C-4601 from ladano remote.
  • Fabrication and Installation of Well-head surface setup at Taj-07. Fabrication and Installation of Well-head surface setup at NWDT-01.
  • The fabrication of separate filling provision loading dock NAIMAT PH I & II. Installation of lean amine pump with suction and discharge spool fabrication & welding PWHD.
  • 2026
  • 2026
  • 2026
  • 2026
  • 2025
  • 2025
  • 2025
  • 2025
  • 2025
  • 2025
  • 2025
  • 2025

  • 2025
  • 2025
  • 2025
  • 2024
  • 2024
  • 2024
  • 2024
  • 2023
  • 2023
  • 2023
  • 2023
  • 2023
  • 2023
  • 2023
  • 2022
  • 2022
  • 2022


  • 2022

  • 2022

  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL

  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL
  • UEPL


  • UEPL

  • UEPL